International supply. Engineering expertise.
office@usk.ua09:00–18:00 · Kyiv

AR gang-operated three-phase loadbreak air break switch for 15–38 kV feeders, 900 A

Three-phase, gang-operated air break switches that make and break load current up to 900 A on 15, 27, 34.5 kV grounded-wye and 38 kV distribution lines. Utilities fit them to sectionalise feeders or bypass sections of the circuit, including as part of distribution automation schemes.

Nominal voltage
15, 27, 34.5 (Grd-Wye), 38 kV
BIL
110 / 150 / 200 kV
Continuous current
900 A
Peak withstand
65000 A

Price, availability and lead time on request. We help with analogue selection, customs clearance and delivery.

Description

Ratings by voltage class are 15 kV at 110 kV BIL, 27 kV at 150 kV BIL, 34.5 kV grounded-wye at 150 kV BIL and 38 kV at 200 kV BIL. Continuous current is 900 A in every class. Peak withstand is 65000 A, the 3 s short-time rating 25000 A symmetrical, and fault making is one operation at 25000 A or three at 20000 A asymmetrical. The switch accepts a deadend working load of 3629 kg (8000 lb) and breaks 3/4 in of ice when opening or closing.

Each switch arrives pre-assembled, adjusted and mounted on its crossarm, so line crews lift it into place at a single point and connect up. Configurations include horizontal, vertical, phase-over-phase and inverted, with standard or long-leakage polymer insulators.

Insulators are ESP silicone polymer on a 57 mm (2-1/4 in) bolt circle, at 110, 150 or 200 kV BIL. Blades are hard-drawn high-conductivity copper; the tips have phosphor-bronze backup springs and copper-tungsten fault-closing inserts, and current transfers silver to silver. A polyurethane interrupter clears the arc without external flame, while a polycarbonate shield keeps ice off the contacts. Base and crank lever are hot-rolled steel galvanised to ASTM A153, and the interphase shaft is glass fibre.

Operation relies on a spring-loaded four-link overtoggle mechanism, with blades opening clockwise. The switch can be driven by torsional or reciprocating controls, or by hookstick from the ground or the crossarm.

Technical specifications

Nominal voltage15, 27, 34.5 (Grd-Wye), 38 kV
BIL110 / 150 / 200 kV
Continuous current900 A
Peak withstand65000 A
Short-time current, 3 s25000 A sym.
Fault making1 × 25000 A or 3 × 20000 A asym.
Deadend load3629 kg (8000 lb)
Ice breaking3/4 in
InsulatorsESP polymer, 57 mm (2-1/4 in) bolt circle
Bladesolid copper
Contactssilver
Interphase shaftglass fibre
GalvanisingASTM A153
Blade openingclockwise

Request a price and lead time

AR gang-operated three-phase loadbreak air break switch for 15–38 kV feeders, 900 A. We reply within one business day.

* — required fields

Or email sales@usk.ua or call 044 339-50-20.

Questions and answers

Which voltage classes are available?

15 kV / 110 kV BIL, 27 kV / 150 kV BIL, 34.5 kV grounded-wye / 150 kV BIL and 38 kV / 200 kV BIL.

Can the switch be worked by hookstick?

Yes, a hookstick option is available from the ground or the crossarm, as well as torsional and reciprocating controls.

What mounting arrangements can be supplied?

Horizontal, vertical, phase-over-phase and inverted, with standard or long-leakage insulators.

Similar equipment from other manufacturers

LET’S CONNECT

Let’s start with your challenge.

Complete a short brief. We will prepare an email you can send from your own email app.

Call us044 339-50-2009:00–18:00
USK ENERGY / SEARCH

Search

Solutions, specialist directions and guides