International supply. Engineering expertise.
office@usk.ua09:00–18:00 · Kyiv

CD1000-2 coupling device for NGR monitors in HRG systems up to 1000 V

The CD1000-2 links an NGR monitor to a high-resistance grounded (HRG) system. It covers a system voltage ULL up to 1000 V with UNGR of 600 V or less, at altitudes up to 5000 m AMSL, and its duty time is unlimited.

System voltage ULL
up to 1000 V (UNGR ≤ 600 V)
Operating altitude
up to 5000 m AMSL
Rated voltage
600 V
Overvoltage category
III

Price, availability and lead time on request. We help with analogue selection, customs clearance and delivery.

Description

The CD1000-2 is the coupling stage between an NGR monitor and an HRG installation with a system voltage ULL up to 1000 V (UNGR ≤ 600 V). It may be used at up to 5000 m AMSL and has an unlimited duty time.

Four terminals are provided. N goes to the star point of the HRG system, RS to RS of the NGRM… monitor, E to the protective earth conductor (internally linked to PE), and PE to the protective conductor via an M4 cable lug. There is no galvanic separation between the circuits. The measuring circuit is N, the output circuit is RS and the protective circuit is E and PE. Rated voltage is 600 V, overvoltage category III, pollution degree 2, with insulation coordination to DIN EN 50178:1997.

The housing measures 80 x 130 x 27 mm and weighs under 700 g. It is screw mounted with an M4x30 screw at 2.5 Nm; terminals are tightened to 0.5…0.6 Nm. Conductors of AWG 24-12 are stripped to 7 mm, and the connecting cable is 1.5 mm² (AWG16) or larger. Where ULL exceeds 690 V (UNGR above 400 V), a 300 x 300 mm cooling surface is needed, so the unit is fixed to an earthed metal plate of at least that size.

Connect terminal N straight to the transformer star point so that the link between the NGR and the star point is monitored too. A direct link between the N terminals of the CD1000-2 and the NGR is not recommended, because a break between the star point and the NGR terminal N would go unnoticed. After wiring to the NGR monitor, carry out a field calibration; the monitor should have run in its operating environment for at least one hour beforehand.

The device presents a resistance of 20 kΩ and a rating current of 30 mA, with ±0.5 % accuracy and a temperature coefficient of 20 ppm/K. Ambient temperature is -40…+70 °C, humidity up to 98 %, protection degree IP30 and flammability class UL 94V-0. Installation, connection and commissioning are for electrically skilled persons only.

Technical specifications

System voltage ULLup to 1000 V (UNGR ≤ 600 V)
Operating altitudeup to 5000 m AMSL
Rated voltage600 V
Overvoltage categoryIII
Pollution degree2
Resistance20 kΩ
Rating current30 mA
Accuracy±0.5 %
Temperature coefficient20 ppm/K
Ambient temperature-40…+70 °C
Humidity≤ 98 %
Protection degreeIP30
Flammability classUL 94V-0
Weight< 700 g
Dimensions80 x 130 x 27 mm
Mountingscrew M4x30, 2.5 Nm

Part numbers

Show all part numbers (1)

B98039053

How it compares with similar models

ParameterCD1000-2 coupling device for NGR monitors in HRG systems up to 1000 VCD1000 coupling device for NGR monitors in HRG systems up to AC 690 VCD14400 coupling device for NGR monitoring in HRG systems up to 14400 VCD5000 coupling device for NGR monitoring in HRG systems up to AC 4300 V and DC 2500 V
Operating altitudeup to 5000 m AMSLup to 2000 mup to 5000 m AMSLup to 5000 m AMSL
Rated voltage600 V—8400 V2500 V
Resistance20 kΩ20 kΩ100 kΩ20 kΩ
Flammability classUL 94V-0UL94 HB—UL 94V-0
Weight< 700 g< 190 g< 4.4 kg< 3800 g

Request a price and lead time

CD1000-2 coupling device for NGR monitors in HRG systems up to 1000 V. We reply within one business day.

* — required fields

Or email sales@usk.ua or call 044 339-50-20.

Questions and answers

What system voltage can the CD1000-2 be used on?

Up to ULL 1000 V with UNGR of 600 V or less, at altitudes up to 5000 m AMSL.

When is a metal cooling plate required?

When ULL is above 690 V (UNGR above 400 V), mount the unit on an earthed metal plate of at least 300 x 300 mm.

Where should terminal N be connected?

Directly to the transformer star point, which also brings the connection between the NGR and the star point under monitoring.

Similar equipment from other manufacturers

LET’S CONNECT

Let’s start with your challenge.

Complete a short brief. We will prepare an email you can send from your own email app.

Call us044 339-50-2009:00–18:00
USK ENERGY / SEARCH

Search

Solutions, specialist directions and guides