
TTS35 to TTS1000 Transformer Test Systems, Three-Phase, IEC 60076 and IEEE C57.12
TTS systems carry out acceptance and routine tests on distribution and small power transformers, single-phase or three-phase, to IEC 60076 and ANSI / IEEE C57.12. Each one includes an adjustable supply, a step-up transformer and a measuring package run by an industrial microprocessor.
- Models
- TTS35, TTS65, TTS155, TTS175, TTS200, TTS250, TTS500, TTS750, TTS1000
- Standards
- ANSI / IEEE C57.12, IEC 60076
- Regulation
- toroidal or column regulator, 50/60 Hz variable frequency source
- Wattmeter accuracy
- ±0.5% of reading plus LSD at 1.0; ±1.5% at 0.3; ±3.0% at 0.1
Price, availability and lead time on request. We help with analogue selection, customs clearance and delivery.
Description
The system suits production lines, checks against factory data before installation, testing after repair or upgrade, and inspection after incidents such as lightning strikes, along with preventive maintenance. In semi-automatic or fully automatic mode, more than 200 transformers can be tested per day, and data capture and report generation are built in.
The base package measures no-load current and losses, short-circuit voltage, rated current and short-circuit (load) losses, and carries out temperature-rise tests. Optional modules add applied and induced voltage tests, winding resistance, turns ratio and vector group checks, insulation resistance and partial discharge. Options include a high voltage AC test set, a motor-generator set, a variable frequency source, TTR and WRM instruments, a compensation capacitor bank and control consoles.
Voltage is adjusted in one of three ways. Smaller systems use a toroidal regulator, larger ones a column regulator, and the third option is a variable frequency source giving 50/60 Hz and higher frequencies for induced voltage tests. The output voltage is changed by motor at an adjustable rise rate, and the tap changer is also motorised, with a position display.
A four-wire measuring arrangement uses a wattmeter and a voltmeter that select ranges automatically, showing RMS and average voltage at the same time. Wattmeter accuracy is ±0.5% of reading plus LSD at power factor 1.0, ±1.5% at 0.3 and ±3.0% at 0.1. The HMI guides the operator step by step, shows the connection diagram for each test and calculates referred losses, efficiency, voltage regulation and short-circuit voltage in percent. Software WIN TTS collects data and produces reports, and a recipe library stores test templates. Calibration and service modes simplify the annual recalibration, which is traceable to NIST.
Protection includes power and control circuit breakers, a zero start interlock, a mushroom-head emergency stop button, fast-acting and inertial protective devices, an external guard circuit, a foot pedal, a red beacon lamp and recessed sockets for output leads. Operating conditions are from 10 to 40°C, humidity up to 95%, non-condensing, and altitudes up to 3300 ft (1000 metres).
Technical specifications
| Models | TTS35, TTS65, TTS155, TTS175, TTS200, TTS250, TTS500, TTS750, TTS1000 |
|---|---|
| Standards | ANSI / IEEE C57.12, IEC 60076 |
| Regulation | toroidal or column regulator, 50/60 Hz variable frequency source |
| Wattmeter accuracy | ±0.5% of reading plus LSD at 1.0; ±1.5% at 0.3; ±3.0% at 0.1 |
| Ammeter ranges (option 1) | 0-1.00/10.00/100.0/1000 A |
| Ammeter ranges (option 2) | 0-20.00/200.0/2000 A |
| Temperature measurement | 10-120 °C, ±1°C |
| Partial discharge | <50 pC at rated voltage |
| Charging current for winding resistance | 10 A |
| Throughput | more than 200 transformers per day |
| Operating temperature | from 10 to 40°C |
| Humidity | up to 95%, non-condensing |
| Altitude | up to 3300 ft (1000 metres) |
| Software | WIN TTS |
Part numbers
Show all part numbers (9)
TTS35, TTS65, TTS155, TTS175, TTS200, TTS250, TTS500, TTS750, TTS1000
Request a price and lead time
TTS35 to TTS1000 Transformer Test Systems, Three-Phase, IEC 60076 and IEEE C57.12. We reply within one business day.
Or email sales@usk.ua or call 044 339-50-20.
Questions and answers
Which tests come in the base package?
No-load current and losses, short-circuit voltage, rated current, short-circuit losses and temperature-rise tests. Applied and induced voltage, winding resistance, turns ratio, insulation resistance and partial discharge are optional.
Which transformers can be tested?
Distribution and small power transformers, single-phase or three-phase, to IEC 60076 and ANSI / IEEE C57.12.
How are reports produced?
The WIN TTS program collects the data on a computer, and interface cables are included. The recipe library stores test templates, and a saved template can be recalled for repeat tests.
Similar equipment from other manufacturers






