International supply. Engineering expertise.
office@usk.ua09:00–18:00 · Kyiv

TRM-203 three-phase winding resistance meter, 25 A DC, OLTC test

The TRM-203 measures the DC winding resistance of all three phases of a transformer without reconnecting cables, with currents from 1 to 25 A. It works out the resistance of delta-connected windings and star windings without an exposed neutral, checks the tap changer and demagnetises the core.

Type
portable three-phase winding resistance meter for transformers
Resistance range
1 µΩ to 2000 Ω
Accuracy
1–19999 µΩ ±0.5%; 20–999 mΩ ±1%; 1–2000 Ω ±1.5% (±1 count)
Test current
1–25 A in 1 A steps

Price, availability and lead time on request. We help with analogue selection, customs clearance and delivery.

Description

All test leads are connected to the transformer bushings once, and the instrument then measures each phase in turn without disconnecting or reconnecting anything. Its range from 1 µΩ to 2000 Ω means it can also serve as a micro-ohmmeter, for instance for the contacts of extra high voltage circuit breakers. Test current is set from 1 to 25 A in 1 A steps. The TRM-403 covers higher currents, up to 40 A, with a range to 500 Ω.

Four input channels and a 60 V DC charging source give a fast, stable reading even on very large transformers, with the voltage kept below 18 V during measurement. For a delta-connected winding, the instrument works out the resistance of each individual winding from phase measurements, and the same applies to a star winding without an exposed neutral.

If the winding temperature is known, the instrument converts the resistance to any chosen temperature, which simplifies comparison with factory reports. A logging mode collects data for up to 90 minutes at 60 second intervals, with 10, 15, 20 and 30 second intervals also available, and each record is time-stamped. The make-before-break mode checks the sequence of tap changer or voltage regulator contacts and plots a dynamic resistance curve that shows any contact break.

Accuracy is ±0.5% of reading plus one count from 1 to 19999 µΩ, ±1% from 20 to 999 mΩ, and ±1.5% from 1 to 2000 Ω. Data is entered from a membrane keyboard, and the report header records the company, substation, transformer details and operator. Memory holds 256 static reports of up to 111 measurements and 120 dynamic ones, and up to 999 reports can be written to a USB drive. The meter runs from 100-240 V AC at 50/60 Hz, with operating temperature from -10 to 50 °C and storage from -30 to 70 °C. The design complies with CAN/CSA C22.2 and UL 61010A-1. The kit has four test leads of 15.24 m each, an OLTC control lead, earth, power and USB cables.

Technical specifications

Typeportable three-phase winding resistance meter for transformers
Resistance range1 µΩ to 2000 Ω
Accuracy1–19999 µΩ ±0.5%; 20–999 mΩ ±1%; 1–2000 Ω ±1.5% (±1 count)
Test current1–25 A in 1 A steps
Voltage60 V DC charging, up to 18 V DC during measurement
Input channels4
Modesdelta, star without neutral, OLTC test, demagnetisation, temperature conversion
Printerbuilt-in thermal printer, 2.5 inch
Internal memory256 static reports of up to 111 measurements, 120 dynamic
External memoryup to 999 reports on a USB drive
InterfacesRS-232C, USB, Bluetooth
Supply100-240 V AC, 50/60 Hz
Operating temperature-10 to 50 °C
Storage temperature-30 to 70 °C
Humidityup to 90% at 40 °C without condensation
SafetyCAN/CSA C22.2 and UL 61010A-1
Dimensions53 × 43 × 24 cm
Weight15.8 kg

Part numbers

Show all part numbers (9)

9060-UC, 8000-0005, 8000-0006, 8000-0015, 8000-0016, 8000-0077, 8000-0149, 8000-0150, 8000-0151

Request a price and lead time

TRM-203 three-phase winding resistance meter, 25 A DC, OLTC test. We reply within one business day.

* — required fields

Or email sales@usk.ua or call 044 339-50-20.

Questions and answers

Do the cables need reconnecting between phases?

No, the cables are connected to all bushings once, and the instrument measures the resistance of each phase by itself.

How is the tap changer checked with this instrument?

The make-before-break mode records a dynamic resistance curve during switching, so any contact break shows on the graph, and tap positions are changed from the front panel.

Can results be compared with factory reports?

Yes, when the winding temperature is entered, the instrument converts the resistance to the required temperature for comparison with factory values.

Similar equipment from other manufacturers

LET’S CONNECT

Let’s start with your challenge.

Complete a short brief. We will prepare an email you can send from your own email app.

Call us044 339-50-2009:00–18:00
USK ENERGY / SEARCH

Search

Solutions, specialist directions and guides