International supply. Engineering expertise.
office@usk.ua09:00–18:00 · Kyiv

STCS Switching Module for Automated Power Transformer Tests on STS Systems

The STCS connects to the STS 5000 or STS 4000 test system and runs turns-ratio, winding resistance and OLTC dynamic tests automatically. The transformer, the test system and the measuring terminals are connected only once.

Compatibility
STS 5000, STS 4000
Module inputs
6 A DC or 300 V AC
OLTC control
240 V AC or 110 V DC
Measuring outputs
AC or DC up to 300 V, plus 10 V DC

Price, availability and lead time on request. We help with analogue selection, customs clearance and delivery.

Description

The STCS is an external switch module that extends both the STS 5000 and the STS 4000 test systems for power transformers fitted with a voltage regulation device, either under load or de-energised. It is used during commissioning and maintenance, and it performs turns-ratio measurements at every tap position, winding resistance measurements and dynamic tests of the tap changer without manual rewiring.

After the single connection, the module switches the circuits itself, so every test on the transformer runs without pauses for moving leads. It sends raise and lower commands to the tap changer, and its control circuits are rated for 240 V AC or 110 V DC.

The module takes 6 A DC or 300 V AC at its inputs from the STS, and it returns AC or DC signals up to 300 V, plus 10 V DC signals, to the measuring inputs of the system. Together with the base system it covers ratio checks across the taps, no-load current, vector group checking, short-circuit impedance and leakage reactance, winding resistance, and dynamic resistance of the on-load tap changer.

Supplied items can include the switching module itself, a set of connection cables and a 20 A DC amplifier module for winding resistance measurement. The cable kit contains 10 coaxial cables, high-voltage and low-voltage connection cables of 2 m each, an external module cable, 6 banana-to-terminator adapters, 8 Kelvin clamps and a 6 m ground cable.

The STS systems the module works with are listed against IEC 61869-2, IEC 61869-3, EN 60076-1, ANSI/IEEE C57.13.1 and other standards for current, voltage and power transformers.

Technical specifications

CompatibilitySTS 5000, STS 4000
Module inputs6 A DC or 300 V AC
OLTC control240 V AC or 110 V DC
Measuring outputsAC or DC up to 300 V, plus 10 V DC
Automatic teststurns ratio at each tap, winding resistance, dynamic on-load tap changer test
Coaxial cables supplied10
High and low voltage connection cables2 m each
Banana to terminator adapters6
Kelvin clamps8
Ground cable6 m

Part numbers

Show all part numbers (3)

12175, 22175, 32175

Request a price and lead time

STCS Switching Module for Automated Power Transformer Tests on STS Systems. We reply within one business day.

* — required fields

Or email sales@usk.ua or call 044 339-50-20.

Questions and answers

Which test systems does the STCS work with?

It is an external module for the STS 5000 and the STS 4000 systems and takes 6 A DC or 300 V AC from them.

Which tests can be run without rewiring the transformer?

Ratio at every tap, winding resistance and the dynamic test of the on-load tap changer, after a single connection to the transformer.

What do the article numbers 12175, 22175 and 32175 cover?

12175 is the switching module, 22175 is the connection cable set and 32175 is the 20 A DC amplifier module for the STCS.

Similar equipment from other manufacturers

LET’S CONNECT

Let’s start with your challenge.

Complete a short brief. We will prepare an email you can send from your own email app.

Call us044 339-50-2009:00–18:00
USK ENERGY / SEARCH

Search

Solutions, specialist directions and guides