STCS PLUS Module for Single-Connection Power Transformer Tests
The STCS PLUS extends the STS 5000 and STS 4000 systems and runs the main power transformer tests automatically after a single connection. Only two multicore cables, one for the primary side and one for the secondary, run to the transformer.
- Compatibility
- STS 5000, STS 4000
- Purpose
- power transformer testing
- Automatic tests
- turns ratio at each tap, no-load current, vector group, short-circuit impedance, leakage reactance, winding resistance, dynamic OLTC test, demagnetisation
- Cables
- two multicore cables, one for the primary side and one for the secondary, on reels
Price, availability and lead time on request. We help with analogue selection, customs clearance and delivery.
Description
The STCS PLUS is used for tests on power transformers at substations, working together with the STS 5000 and STS 4000 multifunction systems. After one connection, the module carries out the main transformer tests automatically: turns ratio at each tap, no-load current, vector group, short-circuit impedance and leakage reactance, winding resistance, dynamic tap changer testing and core demagnetisation.
Only two multicore cables run to the transformer, one for the primary side and one for the secondary, and each is wound on its own reel. The cable is chosen to suit the size of the transformer under test. Two junction boxes are supplied to simplify connecting the cables to the transformer bushings, and one of them carries a high-current switch for automatic measurement of short-circuit impedance.
Running every test from a single connection cuts the time spent on site and lowers the chance of wiring errors. The housing is a black plastic case with handles, and the lid can be removed for easy access. The maximum test voltage of the module is 400 V. The STCS PLUS is offered as an optional kit for the base STS system, which sets and runs the test sequence while the module switches the circuits between stages.
The STS systems carry out tests on current, voltage and power transformers, with IEC61869-2 and IEC61869-3 along with EN 60076-1, ANSI/IEEE C57.13.1 and other standards. The equipment complies with Directives 2004/108/EC and 2006/95/EC, EN61326-1:2006 and CEI EN 61010-1:2010.
Technical specifications
| Compatibility | STS 5000, STS 4000 |
|---|---|
| Purpose | power transformer testing |
| Automatic tests | turns ratio at each tap, no-load current, vector group, short-circuit impedance, leakage reactance, winding resistance, dynamic OLTC test, demagnetisation |
| Cables | two multicore cables, one for the primary side and one for the secondary, on reels |
| Junction boxes | two, one fitted with a high-current switch |
| Maximum test voltage | 400 V |
| Housing | black plastic case with handles |
| Lid | removable |
| Compliance | Directives 2004/108/EC and 2006/95/EC, EN 61326-1:2006, CEI EN 61010-1:2010 |
Request a price and lead time
STCS PLUS Module for Single-Connection Power Transformer Tests. We reply within one business day.
Or email sales@usk.ua or call 044 339-50-20.
Questions and answers
How many cables are needed to connect the transformer?
Two multicore cables, one for the primary side and one for the secondary, each wound on its own reel and linked through two junction boxes.
How does the STCS PLUS differ from the STCS?
The STCS PLUS runs the full set of power transformer tests from one connection, including short-circuit impedance and demagnetisation, while the STCS automates turns ratio, winding resistance and tap changer tests.
How is short-circuit impedance measured automatically?
One junction box has a high-current switch that short-circuits the transformer side without any manual reconnection.