Multi-Station Factory Test Systems for Distribution Transformers, 50 or 60 Hz
Systems with several test stations for serial testing of distribution and power transformers to ANSI / IEEE C57.12 and IEC 60076. Test sequencing, data collection and reporting are fully automated, with throughput above 200 transformers per day.
- Purpose
- serial testing of distribution and power transformers
- Standards
- ANSI / IEEE C57.12, IEC 60076
- Rated frequency
- 50 Hz or 60 Hz
- Phasing
- single-phase and three-phase
Price, availability and lead time on request. We help with analogue selection, customs clearance and delivery.
Description
These systems check that transformers meet their performance and service requirements on the production line, after repair or upgrade, after emergency events such as a lightning strike, and within planned and predictive maintenance. Each system is designed to the customer's requirements.
The configuration includes several test stations for high production volumes. Test sequencing, data collection and report generation are fully automated, and semi-automatic variants are also available. An integrated data collection and reporting system keeps results for every transformer. At high-speed testing the throughput exceeds 200 transformers per day.
Systems are built for single-phase and three-phase transformers and test units at 50 or 60 Hz. The power section uses solid-state voltage regulators and frequency converters, which simplifies maintenance and gives highly repeatable measurements.
Tests to ANSI / IEEE C57.12 and IEC 60076 cover no-load current and losses, short-circuit impedance voltage, load losses, winding and insulation resistance, full-load current, temperature rise, applied and induced voltage, and turns ratio and phase displacement. Optional items extend the capability: an AC hipot set for applied voltage tests, a motor-generator set for induced voltage tests, partial discharge measurement, a variable frequency source, a turns ratio meter (TTR), a winding resistance meter (WRM), capacitive compensation and control consoles.
When requesting a system, the customer specifies the transformer types to be tested, the set of tests required and the expected volume per shift. These data determine the number of test stations and the equipment mix.
Technical specifications
| Purpose | serial testing of distribution and power transformers |
|---|---|
| Standards | ANSI / IEEE C57.12, IEC 60076 |
| Rated frequency | 50 Hz or 60 Hz |
| Phasing | single-phase and three-phase |
| Throughput | over 200 transformers per day |
| Automation | semi-automatic or fully automatic mode |
| Power source | solid-state voltage regulators and frequency converters |
| Main tests | no-load current and losses, short-circuit impedance voltage, load losses, winding and insulation resistance, temperature rise, applied and induced voltage, turns ratio |
| Options | AC hipot, MG set, partial discharge, variable frequency source, TTR, WRM, capacitive compensation, control consoles |
| Reporting | integrated data collection and records |
Request a price and lead time
Multi-Station Factory Test Systems for Distribution Transformers, 50 or 60 Hz. We reply within one business day.
Or email sales@usk.ua or call 044 339-50-20.
Questions and answers
How many transformers can be tested per day?
At high-speed testing the throughput exceeds 200 transformers per day.
Which standards are supported?
ANSI / IEEE C57.12 and IEC 60076 for distribution and power transformers.
Can partial discharge measurement be added?
Yes, partial discharge measurement is one of the additional components available for the system.
Similar equipment from other manufacturers






