International supply. Engineering expertise.
office@usk.ua09:00–18:00 · Kyiv

Multi-Station Factory Test Systems for Distribution Transformers, 50 or 60 Hz

Systems with several test stations for serial testing of distribution and power transformers to ANSI / IEEE C57.12 and IEC 60076. Test sequencing, data collection and reporting are fully automated, with throughput above 200 transformers per day.

Purpose
serial testing of distribution and power transformers
Standards
ANSI / IEEE C57.12, IEC 60076
Rated frequency
50 Hz or 60 Hz
Phasing
single-phase and three-phase

Price, availability and lead time on request. We help with analogue selection, customs clearance and delivery.

Description

These systems check that transformers meet their performance and service requirements on the production line, after repair or upgrade, after emergency events such as a lightning strike, and within planned and predictive maintenance. Each system is designed to the customer's requirements.

The configuration includes several test stations for high production volumes. Test sequencing, data collection and report generation are fully automated, and semi-automatic variants are also available. An integrated data collection and reporting system keeps results for every transformer. At high-speed testing the throughput exceeds 200 transformers per day.

Systems are built for single-phase and three-phase transformers and test units at 50 or 60 Hz. The power section uses solid-state voltage regulators and frequency converters, which simplifies maintenance and gives highly repeatable measurements.

Tests to ANSI / IEEE C57.12 and IEC 60076 cover no-load current and losses, short-circuit impedance voltage, load losses, winding and insulation resistance, full-load current, temperature rise, applied and induced voltage, and turns ratio and phase displacement. Optional items extend the capability: an AC hipot set for applied voltage tests, a motor-generator set for induced voltage tests, partial discharge measurement, a variable frequency source, a turns ratio meter (TTR), a winding resistance meter (WRM), capacitive compensation and control consoles.

When requesting a system, the customer specifies the transformer types to be tested, the set of tests required and the expected volume per shift. These data determine the number of test stations and the equipment mix.

Technical specifications

Purposeserial testing of distribution and power transformers
StandardsANSI / IEEE C57.12, IEC 60076
Rated frequency50 Hz or 60 Hz
Phasingsingle-phase and three-phase
Throughputover 200 transformers per day
Automationsemi-automatic or fully automatic mode
Power sourcesolid-state voltage regulators and frequency converters
Main testsno-load current and losses, short-circuit impedance voltage, load losses, winding and insulation resistance, temperature rise, applied and induced voltage, turns ratio
OptionsAC hipot, MG set, partial discharge, variable frequency source, TTR, WRM, capacitive compensation, control consoles
Reportingintegrated data collection and records

Request a price and lead time

Multi-Station Factory Test Systems for Distribution Transformers, 50 or 60 Hz. We reply within one business day.

* — required fields

Or email sales@usk.ua or call 044 339-50-20.

Questions and answers

How many transformers can be tested per day?

At high-speed testing the throughput exceeds 200 transformers per day.

Which standards are supported?

ANSI / IEEE C57.12 and IEC 60076 for distribution and power transformers.

Can partial discharge measurement be added?

Yes, partial discharge measurement is one of the additional components available for the system.

Similar equipment from other manufacturers

LET’S CONNECT

Let’s start with your challenge.

Complete a short brief. We will prepare an email you can send from your own email app.

Call us044 339-50-2009:00–18:00
USK ENERGY / SEARCH

Search

Solutions, specialist directions and guides