AC-5 Feeder Test Set for Short-Circuit and Earthing Checks, 5 A AC
The AC-5 set establishes whether a feeder has a short circuit or an installed earth. It injects a 5 A AC test current to identify an earthed or unearthed phase, connects to all three phases and includes a self-test mode.
- Purpose
- feeder check for short circuit and earthing
- Test current
- 5 A AC
- Phase state
- earthed or unearthed
- Connection
- three-phase
Price, availability and lead time on request. We help with analogue selection, customs clearance and delivery.
Description
The AC-5 belongs to the equipment used for testing power cables and cable networks. Operators use it before voltage is restored or after repair work to find out whether a short circuit between phases or an installed earth remains on the feeder. The check is carried out on a de-energised and isolated cable.
The principle is based on injecting a 5 A AC test current into the feeder circuit. From the way the current flows, the operator tells an earthed phase apart from an unearthed one, which gives positive confirmation of the condition of each conductor.
The set is connected to the feeder in a three-phase arrangement, so all three phases are checked from one position without re-routing the measuring leads between tests. This shortens preparation time at a substation or distribution point.
A self-test mode lets the operator confirm that the set and its connecting leads are working before they are connected to the equipment. This separates a fault in the instrument from the real condition of the feeder.
The manufacturer lists the SG-6 spark gap system as compatible with the AC-5. The set is used by cable network operating units, at substations and in distribution networks, and it should be operated by trained personnel following safety rules for work on isolated equipment.
Technical specifications
| Purpose | feeder check for short circuit and earthing |
|---|---|
| Test current | 5 A AC |
| Phase state | earthed or unearthed |
| Connection | three-phase |
| Self-test | yes |
| Compatible equipment | SG-6 spark gap system |
Part numbers
Show all part numbers (1)
AC-5
Request a price and lead time
AC-5 Feeder Test Set for Short-Circuit and Earthing Checks, 5 A AC. We reply within one business day.
Or email sales@usk.ua or call 044 339-50-20.
Questions and answers
What is the AC-5 used for?
To establish whether a feeder has a short circuit or an installed earth before voltage is applied.
What test current does the set inject?
A 5 A AC test current, used to tell an earthed phase from an unearthed one.
Which equipment is it used with?
With the SG-6 spark gap system, which the manufacturer lists as compatible with the AC-5.