International supply. Engineering expertise.
office@usk.ua09:00–18:00 · Kyiv

AC-5 Feeder Test Set for Short-Circuit and Earthing Checks, 5 A AC

The AC-5 set establishes whether a feeder has a short circuit or an installed earth. It injects a 5 A AC test current to identify an earthed or unearthed phase, connects to all three phases and includes a self-test mode.

Purpose
feeder check for short circuit and earthing
Test current
5 A AC
Phase state
earthed or unearthed
Connection
three-phase

Price, availability and lead time on request. We help with analogue selection, customs clearance and delivery.

Description

The AC-5 belongs to the equipment used for testing power cables and cable networks. Operators use it before voltage is restored or after repair work to find out whether a short circuit between phases or an installed earth remains on the feeder. The check is carried out on a de-energised and isolated cable.

The principle is based on injecting a 5 A AC test current into the feeder circuit. From the way the current flows, the operator tells an earthed phase apart from an unearthed one, which gives positive confirmation of the condition of each conductor.

The set is connected to the feeder in a three-phase arrangement, so all three phases are checked from one position without re-routing the measuring leads between tests. This shortens preparation time at a substation or distribution point.

A self-test mode lets the operator confirm that the set and its connecting leads are working before they are connected to the equipment. This separates a fault in the instrument from the real condition of the feeder.

The manufacturer lists the SG-6 spark gap system as compatible with the AC-5. The set is used by cable network operating units, at substations and in distribution networks, and it should be operated by trained personnel following safety rules for work on isolated equipment.

Technical specifications

Purposefeeder check for short circuit and earthing
Test current5 A AC
Phase stateearthed or unearthed
Connectionthree-phase
Self-testyes
Compatible equipmentSG-6 spark gap system

Part numbers

Show all part numbers (1)

AC-5

Request a price and lead time

AC-5 Feeder Test Set for Short-Circuit and Earthing Checks, 5 A AC. We reply within one business day.

* — required fields

Or email sales@usk.ua or call 044 339-50-20.

Questions and answers

What is the AC-5 used for?

To establish whether a feeder has a short circuit or an installed earth before voltage is applied.

What test current does the set inject?

A 5 A AC test current, used to tell an earthed phase from an unearthed one.

Which equipment is it used with?

With the SG-6 spark gap system, which the manufacturer lists as compatible with the AC-5.

Similar equipment from other manufacturers

LET’S CONNECT

Let’s start with your challenge.

Complete a short brief. We will prepare an email you can send from your own email app.

Call us044 339-50-2009:00–18:00
USK ENERGY / SEARCH

Search

Solutions, specialist directions and guides