International supply. Engineering expertise.
office@usk.ua09:00–18:00 · Kyiv

Gas turbines 9F.03 / 9F.05 / 9H.01 / 13E2 and CGT25-D

Gas turbines 9F.03, 9F.05, 9H.01, 13E2 and CGT25-D for combined cycle plants. The manufacturer produces the main components of heavy gas turbines in series and has localised the small CGT25-D turbine. Its equipment accounts for about one third of the heavy gas turbine capacity in China.

Heavy gas turbines
9F.03, 9F.05, 9H.01, 13E2 (combined cycles, production of main components)
Small and medium gas turbines
CGT25-D (localised production)
Gas turbine generator
W86C with water-hydrogen cooling
Market share
about 1/3 of the heavy gas turbine capacity in China

Price, availability and lead time on request. We help with analogue selection, customs clearance and delivery.

Description

The manufacturer produces the main components of heavy power gas turbines in series and has mastered series production of small and medium gas turbines. For heavy gas turbines it supplies combined cycle plants based on the 9F.03, 9F.05, 13E2 and 9H.01 turbines. According to the company, its equipment accounts for about one third of the installed capacity of heavy gas turbines in China.

In a combined cycle plant, the exhaust gases of the gas turbine give up heat to a heat recovery boiler, and the steam goes to the steam turbine set, so both generators work on a common grid. Classes E, F and H differ in the gas temperature before the turbine and in the efficiency of the plant. The manufacturer carries out turnkey (EPC) construction of combined cycle plants with turbines of these classes. The choice of class depends on the plant output, the load schedule and the efficiency requirements.

In the segment of small and medium gas turbines, the localisation of the CGT25-D gas turbine has given a complete production system of a world-class technical level. Generators for gas turbine units are made by the subsidiary of the group, including the W86C gas turbine generator with water-hydrogen cooling.

Foreign EPC projects, with differing gas turbine suppliers, include the 1600 MW Syrdarya-II combined cycle plant in Uzbekistan, the largest in Central Asia. The first gas turbine there was synchronised with the grid in February 2026. There are also the 350 MW Manzanillo-III plant in Mexico, the 900 MW BQPS-III plant in Pakistan, and the Nairiyah-2 (1890 MW) and Rumah-2 projects in Saudi Arabia.

The 9F, 9H and 13E2 models belong to the technology platform of a foreign partner. Therefore the degree of localisation and the role of the manufacturer in making the turbine itself are clarified for each specific project. Turbine datasheets are not given in the available materials, so the output, efficiency and machine parameters are confirmed on request. The scope of supply, installation, commissioning and service are defined per project. For preliminary selection, the plant output, load schedule, fuel type and climatic conditions of the site are needed, as well as emission limits, the start-up mode and the availability of a heat recovery boiler on site.

Technical specifications

Heavy gas turbines9F.03, 9F.05, 9H.01, 13E2 (combined cycles, production of main components)
Small and medium gas turbinesCGT25-D (localised production)
Gas turbine generatorW86C with water-hydrogen cooling
Market shareabout 1/3 of the heavy gas turbine capacity in China
EPCcombined cycle plants of classes E, F, H

Request a price and lead time

Gas turbines 9F.03 / 9F.05 / 9H.01 / 13E2 and CGT25-D. We reply within one business day.

* — required fields

Or email sales@usk.ua or call 044 339-50-20.

Questions and answers

Which turbines are combined cycle plants built on?

Combined cycle plants are built on the 9F.03, 9F.05, 13E2 and 9H.01 turbines. For small and medium gas turbines there is the localised CGT25-D model.

Which generator works with gas turbine units?

The W86C gas turbine generator with water-hydrogen cooling. The generators are made by the subsidiary of the group.

Which foreign combined cycle projects have been carried out with this equipment?

The projects include Syrdarya-II of 1600 MW in Uzbekistan, Manzanillo-III of 350 MW in Mexico, BQPS-III of 900 MW in Pakistan and Nairiyah-2 of 1890 MW in Saudi Arabia. The gas turbine suppliers differ between these projects.

Similar equipment from other manufacturers

LET’S CONNECT

Let’s start with your challenge.

Complete a short brief. We will prepare an email you can send from your own email app.

Call us044 339-50-2009:00–18:00
USK ENERGY / SEARCH

Search

Solutions, specialist directions and guides